antistatics architecture
architectural designer
beijing, china
office
august 2021 - march 2022
11,500m2
completed

christopher beckett

luke theodorius santoso

yasser hafizs

annie liu

The Beijing Ideal Building is located in the high-tech industrial and commercial center of Haidian District, just on the inner edge of the 4th ring road. This mixed-use 22 story building is split into office and residential. With floors one to seven for office use and the rest residential.

Our renovation only covers up to the seventh floor, where the offices will be located. The project is split into multiple phases. The first, second, and seventh floor are within the first phase, and the remaining floors are part of the second phase. The building’s façade is also part of the first phase.

My design scope covered the entirety of the seventh floor. The concept was to create a tech environment to promote a healthy and comfortable work space. Although the space was quite short, 2.4 meter tall, the interior was designed to make the space feel taller.

6c01b5c04a9b9712b4eed6e31baab4f.jpg
1217_New Facade Day Grey_32 - Photo.jpg

The renovation contains two phases: the façade, first floor, second floor, and seventh floor are part of the first, and with the remaining 4 floors belonging to the second phase.

Our design intent is to create a tech and industrial feel to the exterior and interior. The language of the façade continues through into the interior to give the relationship a stronger connection.

The façade is created with lasercut aluminum panels which are made offsite and assembled onsite. The perforations of the façade create a dynamic visual upon the existing building.

Within the interior, the spacious and modern design helps emphasize the tech and industrial concept.

AXO_Circulation.jpg
idt13.jpg
idt12.jpg

Materials such as the wood and concrete flooring, white paint, and the black metal frames allow the interior to feel more modern and dynamic.

The concrete blocks are placed selectively nearby the entrances of the elevator and offices. Within the blocks are blue resin boards to offer more of a tech and industrial look.

7th_24 - Photo.jpg
Blue White_32 - Photo.jpg
1116_33 - Photo.jpg

I assisted on the design and drawings of the elevator and façade panels. Once the design was set, I prototyped a 1:1 scale of the panels and coordinated with the fabricators. Each pattern was created in Grasshopper and met the requirements of the fabricators.

idt14.jpg
55b9d9584d2eea4ba22e31e3ca45f01.jpg
bd2ab735f1244909999ab2072b1650c.jpg
142575a919ac1fdf4e68a4827c75a31.jpg
idt16.jpg
876f57bf260d2dc0b3695ad72eb9a4e.jpg
idt15.jpg
1028_Facade_24 - Photo.jpg
bottom of page